![]() |
The table below contains a list of all the plans available on the St Helens web site, together with a brief abstract describing the contents of each file to make it easier to find information. Some of the files were originally very large, but they have now been split up into smaller files. The maximum size of any file is around 6MB. This will still take quite a long time to download if you are using analogue dial-up internet connection, but should take a few minutes or less if you are using broadband. |
Link to Astral Plans on St Helens web site
(wait
for page to load fully, then scroll down to find links - also contains links to
letters of objection received).
You can request a CD containing all the plans
integrated with the table of contents below by sending an email to CDRequest@parksideactiongroup.org.uk.
The table of contents should allow you to quickly find information you are
looking for and loads complete documents promptly directly from the CD.
You will need Adobe Acrobat Reader to view the Astral documents. This is a free
piece of software that you can download and install from Adobe.
The adobe installation may inform you that you need a more up to date version of
Microsoft Windows Installer. If this happens you can click here to download Windows Installer
v3.1. Both Acrobat Reader and Windows Installer are included on the CD.
Paper copies of the plans can be viewed at:
St Helens Town Hall
Warrington Town Hall
Winwick Leisure Centre
Newton Library
Golborne Library
Earlestown Town Hall
Annotation on the tables below:
| [1] | These items appear not to have been published on the St Helens web site. |
| [2] | These items were published on the St Helens web site, but were not provided on some CDs circulated by PAG members. The files were provided on the original Astral CD. |
| Contents | |
| Volume 1 | The Planning, Design and Access Statement |
| Volume 2 | Environmental Statement |
| Volume 3 | Environmental Statement - Figures |
| Volume 4 | Environmental Statement - Appendices |
| Volume 5i | Environmental Statement - Transport Assessment |
| Volume 5ii | Environmental Statement - Access Report |
| Volume 5iii | Environmental Statement - Transport Plan |
| Volume 5iv | Environmental Statement - Drawings |
| Volume 6 | Pre-submission |
| Document | Approx Size | No of Pages | Description | St Helens Web Link |
|
Volume 1 - The Planning, Design and Access Statement Link to Table of Contents |
35MB | 415 | 1.0 Introduction | Volume 1.1 |
| 2.0 Why Rail Freight | Volume 1.2 | |||
| 3.0 Why Parkside | Volume 1.3 | |||
| 4.0 The proposals for Parkside | Volume 1.4 | |||
| 5.0 Alternative Locations | Volume 1.5 | |||
| 6.0 The Green Belt | Volume 1.6 | |||
| 7.0 Summary and Conclusions | Volume 1.7 | |||
| 8.0 Appendices | Volume 1.8 | |||
| Volume 2 - Environmental Statement
(ES) Link to Table of Contents Notes: 2. Section 12.0 Traffic and Transport has no content and simply references Volume 5i.
|
17MB | 456 | 1.0 Introduction | Volume 2.1 |
| 2.0 Development Proposals | Volume 2.2 | |||
| 3.0 Planning Policy | Volume 2.3 | |||
| 4.0 Population and Socio Economic Issues | Volume 2.4 | |||
| 5.0 Landscape and Visual Effects | Volume 2.5 | |||
| 6.0 Ecology and Nature Conservation | see note [1] above | |||
| 7.0 Geomorphology, Geology, Soils and Contamination | Volume 2.7 | |||
| 8.0 Hydrology (Including Flood Risk Assessment), Hydrogeology, and Surface Water Drainage | Volume 2.8 | |||
| 9.0 Agricultural Land and Soil Resources | Volume 2.9 | |||
| 10.0 Air Quality | Volume 2.10 | |||
| 11.0 Noise and Vibration | Volume 2.11 | |||
| 12.0 Traffic and Transport (Summary of TA) - see Volume 5i for content. | Volume 2.12 | |||
| 13.0 Cultural Heritage | Volume 2.13 | |||
| 14.0 Archaeology | Volume 2.14 | |||
| 15.0 Cumulative Effects | see note [1] above | |||
|
Volume 3 - Environmental Statement - Figures Link to Table of Contents
|
24MB | 67 | Figures 1.1 thru 5.10 | Volume 3.1 |
| Figures 5.11 thru 5.35 | see note [1] above | |||
| Figures 6.1 thru 15.1 | Volume 3.3 | |||
| Volume 4 Appendix 1A | 6MB | 104 | EIA Scoping and Consultation Responses | Volume 4 APP 1A |
| Volume 4 Appendix 2A | 208KB | 35 | Sustainability Checklist | Volume 4 App 2A |
| Volume 4 Appendix 2B |
31MB | 179 | Sustainable Power Generating Plant - Proposals (Sections 1 thru 5, Appendices 1 thru 6) [Non bio-fuel proposal] | Volume
4 App 2B-1
[2] |
| Sustainable Power Generating Plant - Proposals [Bio-fuel proposal] - planning application letter for bio-fuel plant - not submitted? | Volume 4 App 2B-2 | |||
| Sustainable Power Generating Plant - Proposals
[Bio-fuel proposal] Photographs Environmental Assessment Drawings |
Volume 4 App 2B-3 | |||
| Volume 4 Appendix 2Bi | 3MB | 16 | Sustainable Power Generating Plant - Proposals - supplementary information - transport of bio-fuel by road during SRFI construction. | Volume 4 App 2B-Bi |
| Volume 4 Appendix 2C | 83KB | 21 | Waste Audit | Volume 4 App 2C |
| Volume 4 Appendix 2D | 1MB | 7 | Landscape Design Details and Information | Volume 4 App 2D |
| Volume 4 Appendix 4A | 2MB | 2 | Map of Parkside travel to work area | Volume 4 App 4A |
| Volume 4 Appendix 4B | 47KB | 39 | EIA Scoping and Consultation Responses | Volume 4 App 4B |
| Volume 4 Appendix 4C | 33KB | 4 | The Parkside travel to work area: 2001 census data | Volume 4 App 4C |
| Volume 4 Appendix 4D | 21KB | 2 | The Parkside travel to work area: district level data | Volume 4 App 4D |
| Volume 4 Appendix 4E | 20KB | 2 | On-site employment at Parkside when fully operational | Volume 4 App 4E |
| Volume 4 Appendix 4F | 23KB | 5 | The distribution of on-site jobs by local authority place of residence | Volume 4 App 4F |
| Volume 4 Appendix 5A | 184KB | 12 | Landscape and Visual Impact Assessment – Methodology and Glossary | Volume 4 App 5A |
| Volume 4 Appendix 5B | 24MB | 32 | Countryside Character Assessment and Mersey
Forest Plan Extracts 10 Pages |
Volume 4 App 5B-1 |
| 17 Pages | Volume 4 App 5B-2 | |||
| 5 Pages | Volume 4 App 5B-3 | |||
| Volume 4 Appendix 5C | 9MB | 16 | Green Belt Study | Volume 4 App 5C |
| Volume 4 Appendix 5D | 53KB | 6 | Visual Effects Table | Volume 4 App 5D |
| Volume 4 Appendix 5E | 138KB | 6 | Lighting – summary of impacts | Volume 4 App 5E |
| Volume 4 Appendix 6A | 484KB | 7 | Ecological Planning and Legislative Context | Volume 4 App 6A |
| Volume 4 Appendix 6B | 8MB | 83 | Initial Ecological Assessment Pages 1 thru 44 |
Volume 4 App 6B-1 |
| Pages 45 thru 84 | Volume 4 App 6B-2 | |||
| Volume 4 Appendix 6C | 2MB | 31 | NVC Survey of Selected Plant Communities | Volume 4 App 6C |
| Volume 4 Appendix 6D | 2MB | 23 | Amphibian Survey | Volume 4 App 6D |
| Volume 4 Appendix 6E | 5.5MB | 45 | Breeding Bird Survey | Volume 4 App 6E |
| Volume 4 Appendix 6F | 770KB | 9 | Water Vole Survey | Volume 4 App 6F |
| Volume 4 Appendix 6G | 2MB | 17 | Bat Surveys | Volume 4 App 6G |
| Volume 4 Appendix 6H | 1MB | 18 | Barn Owl Survey | Volume 4 App 6H |
| Volume 4 Appendix 6I | 4.6MB | 40 | Arboricultural Impact Assessment (Trees) | Volume 4 App 6I |
| Volume 4 Appendix 6J | 2MB | 23 | Survey of Aquatic and Marginal Plant Communities | Volume 4 App 6J |
| Volume 4 Appendix 6K | 1MB | 9 | River Corridor Survey of St Oswald`s Brook | Volume 4 App 6K |
| Volume 4 Appendix 6L | 3.7MB | 25 | River Habitat Survey of St Oswald's Brook | Volume 4 App 6L [2] |
| Volume 4 Appendix 6M | 2.8MB | 28 | Internal Bat Survey of Farm Buildings | Volume 4 App 6M [2] |
| Volume 4 Appendix 7A | 2.2MB | 41 | Mining Report | Volume 4 App 7A [2] |
Volume 4 Appendix 7B |
56MB | 371 | Initial Assessment of Ground Conditions Body of document/Appendix A |
Volume 4 App 7B-1 [2] |
| Appendix B thru Appendix E | Volume 4 App 7B-2 [2] | |||
| Appendix F | Volume 4 App 7B-3 [2] | |||
Volume 4 Appendix 7C |
33MB | 194 | Ground Investigation Body of Document Appendix 1 thru 3 |
Volume 4 App 7C-1 [2] |
| Appendix 4 | Volume 4 App 7C-2 [2] | |||
| Appendix 5 thru 7 | Volume 4 App 7C-3 [2] | |||
| Appendix 8 thru 10 | Volume 4 App 7C-4 [2] | |||
| Volume 4 Appendix 8A | 817KB | 4 | Drainage Calculations | Volume 4 App 8A [2] |
| Volume 4 Appendix 9A | 1.6MB | 30 | Agricultural Assessment | Volume 4 App 9A [2] |
| Volume 4 Appendix 9B | 39KB | 5 | Soil Management Strategy | Volume 4 App 9B [2] |
| Volume 4 Appendix 11A | 103KB | 6 | Figs A 11A to E Noise measurements various locations |
Volume 4 App 11A |
| Volume 4 Appendix 14A | 364KB | 5 | Archaeology Policy Context | Volume 4 App 14A |
| Volume 4 Appendix 14B | 5.4MB | 66 | Archaeological Desk-Based Assessment, Oxford Archaeology North, August 2004 | Volume 4 App 14B |
| Volume 4 Appendix 14C | 112KB | 2 | Archaeology Impact Assessment Criteria | Volume 4 App 14C |
|
Volume 5i - Transport Assessment Link to Table of Contents |
34.5MB | 539 | Transport Assessment Body of document |
Volume 5i TA1 |
| Appendix 1A (accident assessment) | Volume 5i TA2 | |||
| Appendix 1A supporting diagrams | Volume 5i TA3 | |||
| Appendix 1A supporting diagrams | Volume 5i TA4 | |||
| Appendix 1A (accident data), 2A | Volume 5i TA5 | |||
| Appendix 2B thru 3G | Volume 5i TA6 | |||
| Appendix 3H, 4A | Volume 5i TA7 | |||
| Appendix 4B thru 5B | Volume 5i TA8 | |||
|
Volume 5ii - Access Report Link to Table of Contents |
56MB | 188 | Environmental Statement Accessibility Report Body of Document (camera approach) |
Volume 5ii AR1 |
| Figure 1 & Figure 2 | Volume 5ii AR2 | |||
| Figure 3 & Figure 4 | Volume 5ii AR3 | |||
| Figure 5 and Figure 9 | Volume 5ii AR4 | |||
| Figure 10 thru 14 | Volume 5ii AR5 | |||
| Appendix A thru Appendix D | Volume 5ii AR6 | |||
| Appendix E thru Appendix G | Volume 5ii AR7 | |||
| Volume 5iii - Transport Plan Link to Table of Contents |
5.2MB | 76 | Environmental Statement - Transport Plan | Volume 5iii |
| Volume 5iv - Drawings (Details of road layouts and access points) |
16MB | 47 | Environmental Statement - Drawings Alignment Check Schedule |
Volume 5iv Drawings 1 |
| Alignment check drawings | Volume 5iv Drawings 2 | |||
| Alignment check drawings | Volume 5iv Drawings 3 | |||
| Alignment check drawings | Volume 5iv Drawings 4 | |||
| Alignment check drawings | Volume 5iv Drawings 5 | |||
| Volume 6 - Pre-submission Link to Table of Contents |
44MB | 167 | Statement of Pre-Submission 1.0 Introduction |
Volume 6 PS1 |
| 2.0 The Process | Volume 6 PS2 | |||
| 3.0 The first Exhibition | Volume 6 PS3 | |||
| 4.0 The second Exhibition | Volume 6 PS4 | |||
| 5.0 The overall response to comments received | Volume 6 PS5 | |||
| 6.0 Conclusion | Volume 6 PS6 | |||
| Appendix A, B | Volume 6 PS7 | |||
| Appendix C | Volume 6 PS8 | |||
| Appendix D thru F | Volume 6 PS9 | |||
| Addendum (St Helens) | 257 KB | 2 | Map of development showing specifically area within St Helens borough (note a small section is within Warrington borough). | Addendum (St.Helens) |
| Addendum (Warrington) | 749KB | 2 | Map of development showing specifically area within Warrington borough (note a small section is within the Warrington borough). | Addendum (Warrington) |
| Estimated Employment Forecast 18/10/2006 | 417 KB |
1 |
Summary of estimated employment numbers with job roles | Estimated Employment Forecast 18/10/2006 |
| Planning Application Forms 18/10/2006 | 38 KB | 14 | St Helens Council application forms as completed by Astral | Planning Application Forms 18/10/2006 |